The front wall block work on the original workshop failed in the February earthquake and needed to be completely demolished and rebuilt, leaving the upstairs studio remaining. One corner of the building was re-formed by pouring in-situ concrete 3.6metres high. The damaged block work was substituted with large structural steel components to strengthen the building … Continue reading Sepia Lane House
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed